Learn what a store repaint costs per square foot, how night and weekend scheduling works, and what to check in a commercial painter's quote. Includes prep, coating choices and cure times.
Most stores repaint after hours, in phased night or weekend shifts, and the price follows area, prep and coatings. As an outside benchmark, smooth, easy-access storefront exteriors run about $2.50–$3.50 per paintable square foot, and interiors have their own base rates.
What a store repaint costs per square foot
Commercial painting is priced by scope, not a flat rate. These figures are outside benchmarks, not our prices, and they split by surface:
- Storefront exterior: smooth, easy-access storefronts typically fall around $2.50–$3.50 per square foot.
- Interior: some estimators use a rough base rate of $1.50 or $2.00 per square foot, while others multiply the paint cost by four to six times. Interiors also take two to three times as many hours as the same exterior area because of prep, detail and cleanup.
Say your storefront has 1,500 paintable square feet. At the outside benchmark that is 1,500 × $2.50–$3.50, or roughly $3,750–$5,250, and it is not a quote from us. The paint is one share of that: two coats cover 3,000 square feet, and rough surfaces like stucco spread at 200–250 square feet per gallon on this acrylic exterior data sheet, so plan on 12–15 gallons.
Cracked stucco, heavy mildew, difficult access or specialty coatings push you above that range. Medium-density facades often land at $3.75–$5.50 in the same benchmark. A site walk will move the number more than any per-foot figure, and our commercial interior painting quotes post shows how an itemized bid reads.
How night and weekend scheduling keeps the store open
Crews work after closing or over weekends so customers and staff can use the store during business hours. We offer night and weekend scheduling for retail spaces. Get those shifts written into the quote, because hours are a line item you should be able to point to.
The number of shifts depends on wait times between steps, not only on area:
- Topcoats: the acrylic above recoats in 4 hours at 70°F, so two topcoats can fit in one overnight shift at that temperature.
- Stain-blocking primer: Seal Grip needs 24 hours before topcoating for maximum stain resistance, so those areas need a second night.
- Stucco washing: after pressure washing, let stucco dry 24 hours, which adds a shift before painting.
Outside, we schedule for dry stretches and mornings to work around the afternoon storm cycle. More on timing is in our painting tips and advice.
Surface prep before the first coat
Every surface gets cleaned, repaired and primed where needed. Outside, our crews pressure-clean, treat mildew, fill cracks, scrape loose paint and prime chalky stucco. We also adjust for salt air, irrigation rust stains and canal-front splash.
Stucco should be completely dry, at 12% moisture or less, before repainting. For mildew, one manufacturer calls for a wash of 1 part chlorine bleach to 3 parts water, rinsed after 15 minutes. Inside, glossy surfaces get deglossed, and grease and dirt come off before anything else. A quote that says only "prep walls" tells you nothing.
Coatings for retail interiors and storefronts
Choose low-odor, zero-VOC wall paint near occupied areas.
| Surface | Coating | What decides it |
|---|---|---|
| Interior walls | Eco Spec | Low odor that dissipates in under an hour after application |
| Fixtures, doors, trim, shelving | Advance waterborne alkyd | Low-VOC, smooth furniture-like finish |
| Sound stucco | 100% acrylic satin | Under 50 g/L VOC, strong weather resistance |
| Cracked or exposed stucco | Elastite elastomeric | Bridges cracks and moves with the building |
| Block or masonry | Perma-Crete surfacer | 80–110 sq ft per gallon, two-coat system for rain resistance |
The rule that flips acrylic to elastomeric (a thick, stretchy coating) is cracks or wind-driven rain. On sound stucco, standard acrylic often does the job.
Checking a commercial painter before you sign
Verify the contractor's license and insurance. The City of Fort Lauderdale has contractors register their state license or county certificate and liability insurance online, so ask for the registration and a certificate of insurance.
Then compare bids line by line. The quote should name the work hours, the prep for each surface, the product and number of coats, the sheen and the warranty. We are licensed and insured, and our written quote carries a 2-year labor-and-materials warranty. A bid that skips these lines is hard to compare.
Where occupied-store repaints go wrong
Paint that feels dry by morning is not cured. That acrylic reaches full service in 15–30 days, so fresh walls need gentle handling until then. Plan fixture moves, signage installs and cleaning around that window, and keep shopping carts, displays and tape off new paint.
We handle every detail from prep to cleanup, and the point most people get wrong is settling who protects the new finish after each shift. Settle that before you hire anyone, and when you are ready to compare real numbers, request a free estimate.
Related resources
- Commercial Painting Cost in Fort Lauderdale
- Commercial Interior Painting Quotes in Fort Lauderdale
- Blog | PaintPro South Florida - Painting tips & advice
Learn more about our commercial painting services.