A checklist for vetting factory painting contractors: licenses and insurance, written scope, surface prep standards, safety plans, references and warranty red flags. It also shows how to compare bids line by line.
When you decide how to choose a factory painting contractor for industrial facilities, start with paperwork you can check. Ask for the license, insurance certificates, a written scope, a surface prep standard and a safety plan. Then compare bids line by line. Two bids with different prep standards and different coating thicknesses are different jobs, even if both say "paint the steel."
Which license and insurance should a factory painting contractor show?
Ask each bidder for a copy of their Florida contractor license and current certificates for general liability and workers' compensation insurance. Confirm the license directly with the issuing agency, and call the insurer or agent to confirm the policies are active. A bidder who cannot produce these on request should not move to the next round.
General liability covers damage or injury to third parties, such as your equipment or your staff. Workers' compensation covers the contractor's own crew. Check that the liability limits fit the size of your plant and the work near live equipment.
Industrial work also has its own qualification path. AMPP, the coatings and corrosion association, runs a QP program for contractors and says it is meant to give facility owners trained professionals with a proven track record. Its QP 7 program is an introductory level for contractors with less than 6 months of field experience in industrial surface prep and coating. Ask whether the bidder holds a QP credential, and at which level.
For more general vetting questions, see our post on judging a painting contractor before hiring.
What must the written scope of work list?
A comparable bid itemizes the areas to be painted, the prep standard for each surface, the coating system by product name, the film thickness and the warranty terms. A bid that says "paint the steel" cannot be compared with one that names all of these.
Each proposal should state:
- Areas: which steel, concrete, walls or floors are included, and which are excluded.
- Prep standard: the SSPC/NACE level for each substrate.
- Coating system: primer, intermediate and finish coat by product name.
- Dry film thickness (DFT): the thickness in mils, which is thousandths of an inch, for each coat and in total.
- Warranty and schedule: written terms, plus work windows around production.
Here is a worked comparison using manufacturer system guides. Bid A calls for SP-2/3 prep with an alkyd/acrylic/acrylic system, which one coatings manufacturer lists at a total DFT of 6.0 to 9.5 mils. Bid B calls for SP-6 prep with an epoxy/epoxy system listed at 7.0 to 11.0 mils total. The thickness ranges overlap, but the prep and chemistry differ, so the price gap reflects different work. A lower prep standard can shorten coating life.
Coating choice also depends on exposure. Our post on how exterior coatings hold up in South Florida covers sun and salt air, which matter for outdoor steel at a plant.
What surface prep standards apply to steel and concrete?
For steel, the bid should name an SSPC/NACE standard rather than "clean and prime." The standards do not rank by number, and AMPP notes that higher numbers do not necessarily mean a higher degree of prep.
- SP-2 and SP-3 (hand and power tool cleaning): these remove loose mill scale, rust and paint, not adherent material.
- SP-6 (commercial blast cleaning): abrasive blasting to a defined degree of cleanliness. It is a lower degree than the next two levels.
- SP-5 (white metal blast): the surface is free of all visible oil, grease, dust, dirt, mill scale, rust and coating.
- SP-10 (near-white blast): a step between SP-6 and SP-5. One manufacturer's guide specifies SP-10 for a zinc-rich primer in severe environments.
Match the prep level to the coating's data sheet. If a bidder proposes SP-3 under a system whose data sheet calls for SP-6, ask them to explain.
For concrete, one epoxy data sheet requires new concrete to be at least 28 days old with an open surface texture, with all curing compounds and sealers removed. It also calls for a 100% solids epoxy mortar to fill wide cracks and joints. Ask each bidder how they will profile the slab, by shot blasting or grinding, and which data sheet they follow.
What should a safety plan cover in an operating plant?
The plan should be written and specific to your building. At minimum it should cover:
- Ventilation and containment for spray and solvent areas.
- Hot work, confined space entry and lockout/tagout where equipment is involved.
- Lead testing and containment if you have older coatings, plus waste handling.
- Coordination with production: work windows, access routes and who signs off each area.
Chemical hazards need written communication between employers. OSHA's 1989 Hazard Communication Standard instruction said that on multi-employer construction worksites, an employer must give the other employer a data sheet or say where it is kept for each hazardous chemical. Those documents are now called Safety Data Sheets. Ask the bidder to supply them for every product before work starts.
What references, warranty terms and red flags should you check?
Call at least two references from past industrial projects. Ask whether the coating is still adhering after the first year, how the crew handled prep and inspection, and whether schedule changes reached the plant manager in advance.
Ask for the warranty in writing, with what it covers and for how long. Watch for these red flags:
- No written warranty.
- Unwillingness to name the coating product.
- No prep standard in the scope.
- No safety plan.
- Insurance certificates "to follow later."
More vetting ideas are on the PaintPro blog.
Frequently asked questions
Should I require a QP-certified contractor?
It is a strong filter, not a legal requirement. AMPP says QP contractors have the experience, knowledge and equipment to meet applicable guidelines. If you also accept uncertified bidders, ask for equivalent proof such as inspection records and references.
What if two bids use different prep standards?
Ask both to price the same standard, the one the coating's data sheet calls for. Then compare totals. Until then, the lower number may only reflect less prep.